On September 4, 1882, Thomas Edison's Pearl Street Station in New York City, New York, became the first commercial central electric power station in the United States. Nearly six decades later, the 1940 Census became the first to ask about home lighting sources, finding that 78.7 percent of all occupied housing units in the United States had electric lights. Today, the U.S. Energy Information Administration reports that nearly every American household has access to electricity.
Jump to:
On September 4, 1882, the Edison Electric Illuminating Company's Pearl Street Station began supplying electricity to nearby customers in New York City, New York. This first commercial central power station in the United States initially supplied electricity to 59 customers and expanded to serve more than 500 customers by 1884. Although a fire destroyed the power station in 1890, it was rebuilt and continued to supply direct-current electricity to customers in New York City until 1895.
The Edison Electric Illuminating Company's Pearl Street Station, New York, April 1890.
Within months of demonstrating a practical incandescent lamp, Thomas Edison built small power stations and lighting systems at his laboratory in Menlo Park, New Jersey, in 1879, and aboard the steamship Columbia in 1880. He demonstrated his electrical system at the International Exposition of Electricity in Paris in 1881. That same year, the Edison Electric Illuminating Company broke ground on the Pearl Street Station. Edison chose to build the nation's first commercial central power station in the heart of New York City's Financial District because of the proximity of a large number of potential customers and investors.
Edison designed and installed six 27-ton "Jumbo" steam-driven dynamos in the Pearl Street Station. The dynamos were capable of generating enough low-voltage direct-current electricity to power approximately 7,200 incandescent lamps connected by nearly 100,000 feet of underground copper wire within the station's one-square-mile service area.
Although the power station was not financially successful initially, it proved that Edison's design worked and drew investors. Additional power stations were soon built in New York City. Edison licensed installations in cities throughout the United States, including central power plants in Shamokin, Pennsylvania, in November 1882; in Brockton, Lawrence, and Fall River, Massachusetts; and in Newburgh, New York, in 1883. He licensed a number of central power plants internationally, including those in Milan, Italy; Amsterdam, the Netherlands; Brussels, Belgium; and St. Petersburg, Russia, by the end of 1883.
A fire on January 2, 1890, nearly destroyed the Pearl Street Station. Workers quickly rebuilt the station and restored electric service in just 11 days. More efficient technology and plant designs expanded service areas and made the Pearl Street Station less profitable and increasingly obsolete. The Edison Electric Illuminating Company closed the station in 1895. The original station building was torn down, and the site was redeveloped. The American Scenic and Historic Preservation Society and the New York Edison Company installed a plaque commemorating Pearl Street Station in 1917. One of Edison's 27-ton Jumbo dynamos remains operational and is on display at the Henry Ford in Dearborn, Michigan.
You can learn more about Pearl Street Station, electrification, and power generation using Census Bureau data and records. For example:
Thomas Edison's patent drawing and application for an improvement in electric lamps, patented January 27, 1880.
Former Census Bureau director Barbara Everitt Bryant.
On September 7, 1989, President George H.W. Bush nominated Barbara Everitt Bryant as the U.S. Census Bureau's first female director.
Bryant earned a bachelor's degree in physics from Cornell University. After her three children started school, she attended Michigan State University and received a master's degree in journalism in 1967 and a doctorate in communications three years later. While working at Market Opinion Research, headquartered in Detroit she directed national research for three presidential commissions: President Gerald Ford’s Commission on Observance of International Women’s Year (1975–77), President Jimmy Carter’s Commission on World Hunger (1980), and President Ronald Reagan’s Commission on Americans Outdoors (1986). She also managed survey studies and consulting projects for media, transportation, education, and health care organizations.
Bryant became Census Bureau director after most of the planning for the 1990 Census had been completed, but led the actual enumeration and the agency's response to accusations of an undercount. She also championed the agency's move toward computer-assisted enumeration.
Bryant left the Census Bureau in 1993. She took a position at the University of Michigan’s Ross School of Business, where she was both a research scientist and director of the American Customer Satisfaction Index. She was active in the American Marketing Association, serving on its board and foundation board, and the American Association of Public Opinion Research. She also was a board member of the Roper Center for Public Opinion Research and a fellow of the American Statistical Association.
On January 19, 1993, Bryant participated in an oral history interview shortly after stepping down as Census Bureau director.
The Grand Coulee Dam Power Station in Grant and Okanogan counties, Washington, and the Bath County Pumped Storage Station in Bath County, Virginia, are among the largest hydroelectric power stations in the United States.
Constructed between 1933 and 1942, the Grand Coulee Dam supplies hydroelectric power and irrigates farmland. Grand Coulee Dam produces approximately 20.2 terawatt-hours of electricity annually and supplies about 35 percent of the electricity used in the northwestern United States while irrigating more than 670,000 acres of farmland.
The Bath County Pumped Storage Station supplies up to 3.3 terawatt-hours of electricity annually. Unlike Grand Coulee Dam, the Bath County Pumped Storage Station generates electricity from water flowing between an upper and lower reservoir during periods of peak electricity demand.
According to the U.S. Energy Information Administration, hydropower generation accounted for about 5.7 percent of the nation's electrical needs in 2023. That same year, American Community Survey found 121.4 million households in the United States paid for electricity. Of these households, nearly 28 million paid $100 to $149 for electricity every month.
Dedicated on September 30, 1935, Hoover Dam generates power from water stored in Lake Mead—the largest man-made reservoir in the United States.
The Edison Company installed electricity at the White House in September 1891.
Electricity was introduced to the White House in September 1891. The Edison Company supplied power to the White House from a direct-current generator installed in the basement of the State, War, and Navy Building—the present-day Eisenhower Executive Office Building. President Benjamin Harrison and his wife were so apprehensive about the new technology that they asked White House staff to operate the light switches.
Gas fixtures continued to supplement electrical lights until President Theodore Roosevelt remodeled the White House in 1902. That renovation included the removal of the remaining gas lights, rewiring of the executive mansion, and the installation of a dedicated direct-current electric generator. The White House switched to alternating current and connected to the municipal electric grid during an extensive renovation that President Harry S. Truman undertook between 1948 and 1952.
President Jimmy Carter first installed solar thermal water-heating panels on the White House roof in 1979. In 2013, the installation of photovoltaic panels on the White House roof was expected to supply a portion of the executive residence's annual electricity needs.