Productivity Dispersion and Plant Selection in the Ready-Mix Concrete Industry

Written by:
Working Paper Number: CES-11-25

Abstract

This paper presents a quantitative model of productivity dispersion to explain why inefficient producers are slowly selected out of the ready-mix concrete industry. Measured productivity dispersion between the 10th and 90th percentile falls from a 4 to 1 difference using OLS, to a 2 to 1 difference using a control function. Due to volatile productivity and high sunk entry costs, a dynamic oligopoly model shows that to rationalize small gaps in exit rates between high and low productivity plants, a plant in the top quintile must produce 1.5 times more than a plant in the bottom quintile.

Page Last Revised - October 8, 2021